Crossings Mall
The bridge at the Crossings Mall Plaza that was wiped out in last June’s flood is finally being rebuilt. Construction crews have built concrete pillars on either side of the Little Sandy Creek. The bridge to the shopping center in Elkview will be completed later this summer.