Crossings Mall Bridge
A plan is in place to replace the bridge at Crossings Mall. Bankruptcy Judge Patrick Flatley approved a finance plan yesterday. The construction by Applied Construction Solutions of Bridgeport will begin right away and the bridge should be open again later this summer. It was wiped out in the June 23rd flood last summer.